Citation: | SHEN Yan-guang, DONG Chuan-tong, HE Hong-jiang, HAO Zhong-xiao, CHEN Xiang-guo. Design and Implementation of Mining Linkage Management System of Coal Mine[J]. Journal of Mine Automation, 2005, 31(4): 43-44. |
[1] | PENG Yujing, LIU Jian, GAO Tong, LIAO Lingsong, GAO Xiaofeng. Design of risk prediction and early warning system of coal mine enterprises based on GIS[J]. Journal of Mine Automation, 2018, 44(6): 96-100. DOI: 10.13272/j.issn.1671-251x.2017110031 |
[2] | WU Jiayi, HAN Litao, SHI Meng, LEI Yanhui. Mining team management system based on GIS[J]. Journal of Mine Automation, 2016, 42(5): 81-84. DOI: 10.13272/j.issn.1671-251x.2016.05.018 |
[3] | XIANG Shiyao, CHEN Yijin, XU Dongjing. Management system of multi-source spatial data in open pit coal mine based on GIS[J]. Journal of Mine Automation, 2015, 41(12): 1-4. DOI: 10.13272/j.issn.1671-251x.2015.12.001 |
[4] | ZHANG Weiguo. An implementation scheme of GIS graphics system based on OpenLayers[J]. Journal of Mine Automation, 2015, 41(9): 71-73. DOI: 10.13272/j.issn.1671-251x.2015.09.018 |
[5] | NIE Li-gong, ZHANG Hai-jun. Underground power monitoring and management system based on GIS[J]. Journal of Mine Automation, 2013, 39(11): 93-95. DOI: 10.7526/j.issn.1671-251X.2013.11.024 |
[6] | HAN A. Design of Management System of Coal Mine Digging Linking and Its Implementatio[J]. Journal of Mine Automation, 2011, 37(12): 84-86. |
[7] | SONG Yun-bo, FAN Jian-hua. Design of MIS for Non-coal Mines Based on USB-Key[J]. Journal of Mine Automation, 2010, 36(2): 70-74. |
[8] | ZHANG Bai-hui~, YANG Ming-qiang~. Research of Model of Hidden Trouble Recognizing and Early Warning for Natural Mine Disaster Based on GIS[J]. Journal of Mine Automation, 2008, 34(3): 15-18. |
[9] | FU Yan , WANG Jun , GAO Jian-xin . Design and Realization of Management and Information System for Coal Sale Based on C/S Structure[J]. Journal of Mine Automation, 2002, 28(3): 48-50. |
[10] | ZHANG Qun-hui, WANG Jian-jun, GONG Shang-fu. Discussion on Developing Method of Universal Query Module of MIS with VB[J]. Journal of Mine Automation, 2001, 27(5): 3-5. |