Citation: | KAN Lei. Application of active advanced support technology in fully mechanized top-coal caving face with large mining height at Madiliang Coal Mine[J]. Journal of Mine Automation,2025,51(6):44-54. DOI: 10.13272/j.issn.1671-251x.2025030015 |
In response to issues such as limited operating space and high labor intensity associated with advanced hydraulic support in fully mechanized top-coal caving faces with large mining height, this study takes the auxiliary transport roadway of the 507 working face in Madiliang Coal Mine as the research object and proposes a support scheme that uses active advanced support with reinforcement anchor cables to replace advanced hydraulic support. The TS-C1201 type borehole imaging device for mining was used to observe fractures within the coal and rock mass. The results showed that a small number of vertical fractures were present in the shallow part of the roof of the 507 top-coal caving face, while fractures were not developed in other areas, indicating that the overall roof integrity was good and the conditions were suitable for implementing active advanced support. Based on the above observation results, an active advanced support scheme using bolts (cables) was designed. A combined support system of “bolts + cables + steel strips” was adopted for the roof, with the installation of seven left-handed deformed-thread steel bolts without longitudinal ribs and three cables, in combination with M3-type steel strips. Four full-thread bolts were installed on the left sidewall, and four fiberglass bolts were installed on the right sidewall. Theoretical calculations indicated that the reinforcement anchor cables used in the active advanced support system enhanced the strength of the support system and met the support requirements for the advanced section of the roadway. Numerical simulation results showed that during the mining of the 507 fully mechanized top-coal caving face, under the original active advanced support scheme, significant stress concentration occurred within 10 meters ahead of the working face, with a maximum vertical stress of 4.5 MPa and a maximum roof subsidence of approximately 35 mm. Within 30 meters ahead of the working face, the maximum vertical stress reached approximately 5.5 MPa. After the implementation of reinforcement support with bolts (cables), the vertical stress in the roadway decreased slightly, and the distribution of the vertical stress field was optimized. However, there was no significant change in the maximum roof subsidence within the 10–30 m range ahead of the working face. These findings demonstrated that replacing advanced hydraulic supports with active advanced support using reinforcement bolts (cables) could meet the requirements for advanced support. Industrial test results showed that the reinforcement anchor cables remained stable under a load of approximately 81 kN. The maximum displacements of the roadway roof and floor, and of the two sidewalls, were 41 mm and 37 mm respectively. No separation was observed in the roof, indicating that the support scheme meets the requirements for safe production.
[1] |
宋选民,朱德福,王仲伦,等. 我国煤矿综放开采40年:理论与技术装备研究进展[J]. 煤炭科学技术,2021,49(3):1-29.
SONG Xuanmin,ZHU Defu,WANG Zhonglun,et al. Advances on longwall fully-mechanized top-coal caving mining technology in China during past 40 years:theory,equipment and approach[J]. Coal Science and Technology,2021,49(3):1-29.
|
[2] |
王家臣. 我国综放开采40年及展望[J]. 煤炭学报,2023,48(1):83-99.
WANG Jiachen. 40 years development and prospect of longwall top coal caving in China[J]. Journal of China Coal Society,2023,48(1):83-99.
|
[3] |
王国法,张德生. 煤炭智能化综采技术创新实践与发展展望[J]. 中国矿业大学学报,2018,47(3):459-467.
WANG Guofa,ZHANG Desheng. Innovation practice and development prospect of intelligent fully mechanized technology for coal mining[J]. Journal of China University of Mining & Technology,2018,47(3):459-467.
|
[4] |
庞义辉,关书方,姜志刚,等. 综放工作面围岩控制与智能化放煤技术现状及展望[J]. 工矿自动化,2024,50(9):20-27.
PANG Yihui,GUAN Shufang,JIANG Zhigang,et al. Current status and prospects of surrounding rock control and intelligent coal drawing technology in fully mechanized caving face[J]. Journal of Mine Automation,2024,50(9):20-27.
|
[5] |
张民,王海锐,梁顺,等. 不规则工作面注浆锚索代替单体及液压支架主动式超前支护技术[J]. 金属矿山,2023(7):176-184.
ZHANG Min,WANG Hairui,LIANG Shun,et al. Active advanced support technique with grouting cables instead of hydraulic props and supports in irregular working face[J]. Metal Mine,2023(7):176-184.
|
[6] |
郭继圣. 综采工作面巷道超前液压支架选型设计及展望[J]. 煤炭科学技术,2016,44(11):30-35.
GUO Jisheng. Selection design and outlook on advanced hydraulic powered support of gateway in fully-mechanized coal mining face[J]. Coal Science and Technology,2016,44(11):30-35.
|
[7] |
刘晓杰,宁掌玄,陈涛涛,等. 回采巷道超前支架应用现状与发展[J]. 山西大同大学学报(自然科学版),2023,39(5):101-105.
LIU Xiaojie,NING Zhangxuan,CHEN Taotao,et al. Application status and development of sdvanced support in mining roadway[J]. Journal of Shanxi Datong University(Natural Science Edition),2023,39(5):101-105.
|
[8] |
刘小雄,马宝,陈建华. 综采工作面智能化开采装备与技术研究[J]. 煤炭科学技术,2022,50(S2):271-276.
LIU Xiaoxiong,MA Bao,CHEN Jianhua. Study on coal seam transparency technology of thin coal seam intelligent mining face[J]. Coal Science and Technology,2022,50(S2):271-276.
|
[9] |
刘玉堂,刘爱卿. 锚杆支护作用原理及影响因素分析[J]. 煤炭科学技术,2013,41(增刊2):138-140.
LIU Yutang,LIU Aiqing. Analysis influencing factors and action principle of bolt supporting[J]. Coal Science and Technology,2013,41(S2):138-140.
|
[10] |
李伟,程久龙. 深井煤巷高强高预紧力锚杆支护技术的研究与应用[J]. 煤炭工程,2010(1):30-31,33.
LI Wei,CHEN Jiulong. Research and application of high strength and high preload anchor support technology in deep coal mine[J]. Coal Engineering,2010(1):30-31,33.
|
[11] |
康红普. 煤矿巷道支护与加固材料的发展及展望[J]. 煤炭科学技术,2021,49(4):1-11.
KANG Hongpu. Development and prospects of support and reinforcement materials for coal mine roadways[J]. Coal Science and Technology,2021,49(4):1-11.
|
[12] |
张德生,牛艳奇,孟峰. 综采工作面超前支护技术现状及发展[J]. 矿山机械,2014,42(8):1-5.
ZHANG Desheng,NIU Yanqi,MENG Feng. Status and development of advance supporting technology on fully-mechanized faces[J]. Mining & Processing Equipment,2014,42(8):1-5.
|
[13] |
姚强岭,朱贵伟,郑闯凯,等. 厚煤层沿空巷道主动式超前支护技术与实践[J]. 采矿与岩层控制工程学报,2022,4(1):5-15.
YAO Qiangling,ZHU Guiwei,ZHENG Chuangkai,et al. Active advanced support technology and practice of thick coal seam along goaf roadway[J]. Journal of Mining and Strata Control Engineering,2022,4(1):5-15.
|
[14] |
钟阳,罗伙根. 大断面回采巷道超前支护技术研究与应用[J]. 煤炭工程,2024,56(3):57-65.
ZHONG Yang,LUO Huogen. Research and application of advance support technology for large section entry[J]. Coal Engineering,2024,56(3):57-65.
|
[15] |
陈廷学,姚强岭,马镇涛. 钱营孜煤矿台阶工作面分阶段锚索式超前支护技术[J]. 煤炭技术,2023,42(1):64-69.
CHEN Tingxue,YAO Qiangling,MA Zhentao. Phased anchor cable advance support technology for bench face in Qianyingzi Coal Mine[J]. Coal Technology,2023,42(1):64-69.
|
[16] |
谢龙,张德兵,梁顺. 回采巷道注浆锚索超前支护优化及效果模拟[J]. 采矿与岩层控制工程学报,2022,4(3):50-60.
XIE Long,ZHANG Debing,LIANG Shun. Optimization and simulation of the effect of grouted cable bolts as advanced support in longwall entries[J]. Journal of Mining and Strata Control Engineering,2022,4(3):50-60.
|
[17] |
范东林,王庆雄,陈苏社,等. 8.8 m大采高工作面主运巷超前支护技术研究与应用[J]. 煤炭工程,2024,56(3):124-129.
FAN Donglin,WANG Qingxiong,CHEN Sushe,et al. Research and application of advance support technology for main haulage roadway in 8.8 m large mining height working face[J]. Coal Engineering,2024,56(3):124-129.
|
[18] |
杨俊彩,范东林,陈苏社,等. 补连塔煤矿回采巷道锚索主动式超前支护技术应用[J]. 煤炭工程,2024,56(2):59-65.
YANG Juncai,FAN Donglin,CHEN Sushe,et al. Application of active advance support technology with anchor cable in entries of Bulianta Coal Mine[J]. Coal Engineering,2024,56(2):59-65.
|
[19] |
王宜清,马守龙,姚强岭,等. 分区域主动式超前支护技术研究及应用[J]. 煤炭工程,2022,54(10):57-61.
WANG Yiqing,MA Shoulong,YAO Qiangling,et al. Active advance support technology and practice of "regional differentiation"[J]. Coal Engineering,2022,54(10):57-61.
|
[20] |
曹庆华,杨月飞,陈慧明,等. 深部沿空留巷超前锚索补强支护及数值模拟[J]. 中国矿业,2023,32(4):133-139.
CAO Qinghua,YANG Yuefei,CHEN Huiming,et al. Numerical simulation of advanced anchor cable active reinforcement and support in deep gob side entry retaining[J]. China Mining Magazine,2023,32(4):133-139.
|
[21] |
刘琦,徐靖. 厚硬顶板回采巷道超前补强锚索协同支护技术研究[J]. 煤矿现代化,2021,30(6):112-116.
LIU Qi,XU Jing. Study on advance reinforcement anchor cable cooperative support technology of thick and hard roof mining roadway[J]. Coal Mine Modernization,2021,30(6):112-116.
|
[22] |
任艳芳,宁宇. 浅埋煤层长壁开采超前支承压力变化特征[J]. 煤炭学报,2014,39(增刊1):38-42.
REN Yanfang,NING Yu. Changing feature of advancing abutment pressure in shallow long wall working face[J]. Journal of China Coal Society,2014,39(S1):38-42.
|
[23] |
刘德军,左建平,刘海雁,等. 我国煤矿巷道支护理论及技术的现状与发展趋势[J]. 矿业科学学报,2020,5(1):22-33.
LIU Dejun,ZUO Jianping,LIU Haiyan,et al. Development and present situation of support theory and technology in coal mine roadway in China[J]. Journal of Mining Science and Technology,2020,5(1):22-33.
|
[24] |
姚强岭,王烜辉,夏泽,等. 煤矿长壁采煤主动式超前支护关键技术及应用[J]. 采矿与安全工程学报,2020,37(2):289-297.
YAO Qiangling,WANG Xuanhui,XIA Ze,et al. Key technology and application of active forepoling for longwall coal mining in coal mine[J]. Journal of Mining & Safety Engineering,2020,37(2):289-297.
|
1. |
朱劲磊,梁均海,付志超,欧嘉俊,滕俊. 基于TDOA算法的基建现场施工人员定位研究. 自动化仪表. 2024(04): 9-13 .
![]() | |
2. |
朱慧泉,付波. 一种激光红外图像的小区域目标定位方法. 电子器件. 2024(05): 1221-1226 .
![]() | |
3. |
邵斌,王磊,黄瀚. 煤矿井下带式输送机智能视频远程巡检系统设计. 煤矿机械. 2023(12): 198-200 .
![]() | |
4. |
杨光耀. 基于深度学习网络的井下视频图像目标检测方法研究. 中国新通信. 2021(17): 113-114 .
![]() | |
5. |
龚云,杨庞彬,颉昕宇. 结合同态滤波与直方图均衡化的井下图像匹配算法. 工矿自动化. 2021(10): 37-41+61 .
![]() |