ZHU Xiaojuan, ZHANG Hao. Research on task allocation of edge computing in intelligent coal mine[J]. Journal of Mine Automation, 2021, 47(6): 32-39. DOI: 10.13272/j.issn.1671-251x.2021050011
Citation: ZHU Xiaojuan, ZHANG Hao. Research on task allocation of edge computing in intelligent coal mine[J]. Journal of Mine Automation, 2021, 47(6): 32-39. DOI: 10.13272/j.issn.1671-251x.2021050011

Research on task allocation of edge computing in intelligent coal mine

More Information
  • Most of the current task allocation of edge computing in intelligent coal mine uses centralized allocation algorithms, which takes a single factor into account when prioritizing tasks and does not consider the narrow and long characteristics of the coal mine network topology. In order to solve this problem, combined with the characteristics of tasks in coal mine scenarios, an edge computing task allocation strategy based on dynamic priority and real-time bidding strategy is proposed. The tasks are classified into different levels. On the one hand, tasks that exceed the computing capacity of edge nodes are directly uploaded to the cloud for processing. On the other hand, the tasks that can be processed at the edge computing layer are classified into three levels according to their importance. Level 1 is for tasks related to environmental monitoring and staff safety operation protocol detection. Level 2 is for tasks related to production process equipment status monitoring. And level 3 is for other routine tasks. However, allocating tasks according to these 3 levels alone can cause low priority tasks to be blocked by high priority tasks. The urgency of the task must be considered as well so that the tasks approaching the deadline are given higher priority. The priority is dynamically generated and the task queue is updated according to the fixed priority, urgency and calculation amount of the task. According to the characteristics of narrow and long underground coal mine roadways and restricted transmission, a real-time bidding model for task allocation is established. The quotation of the edge node for tasks is determined by four factors, including computing capacity, processing time, energy consumption and waiting time of the edge node. The requesting node transmits the task to the edge node that has the lowest processing cost within 2 hops and satisfies the task demand for execution, thereby completing task allocation. The simulation results show that the proposed task allocation strategy can allocate tasks to edge nodes with matching computing power for processing, so that edge nodes can process urgent and important tasks first. The method achieves better results in reducing delay and energy consumption, and optimizing resource allocation.
  • Related Articles

    [1]MA Yangjin, FU Maoquan, XU Zhi, LI Jingzhao. Intelligent multi-node communication strategy of mine cyber-physical system[J]. Journal of Mine Automation, 2020, 46(3): 38-42. DOI: 10.13272/j.issn.1671-251x.17544
    [2]ZHANG Mei, NIU Shihui, LI Jingzhao. Research on architecture of coal mine cyber-physical system and its sensing and control node[J]. Journal of Mine Automation, 2019, 45(2): 30-34. DOI: 10.13272/j.issn.1671-251x.2018090075
    [3]GAO Li, HU Yanjun, ZHANG Lei, ZHAO Tong. Wireless accurate location algorithm based on node cooperation in underground coal mine[J]. Journal of Mine Automation, 2018, 44(8): 39-45. DOI: 10.13272/j.issn.1671-251x.2018030086
    [4]ZHAO Tong, LI Xiansheng, ZHANG Lei, DING Enjie, HU Yanjun. Weighted centroid localization algorithm based on node cooperation in coal mine underground[J]. Journal of Mine Automation, 2018, 44(8): 32-38. DOI: 10.13272/j.issn.1671-251x.2018010007
    [5]LIANG Zuosheng. Research of energy consumption of mine-used terminal node[J]. Journal of Mine Automation, 2015, 41(5): 48-51. DOI: 10.13272/j.issn.1671-251x.2015.05.012
    [6]DU Xiaojie, WANG Yongjiao. Design of terminal nodes of wireless industry network WIA-PA[J]. Journal of Mine Automation, 2014, 40(2): 15-18. DOI: 10.13272/j.issn.1671-251x.2014.02.005
    [7]YUAN Xiao-ping, DENG Heng-yan, YUE Mi. Design of Underground Communication Node Based on CAN Bus[J]. Journal of Mine Automation, 2010, 36(8): 110-113.
    [8]YAN Chun, LOU Hua-ping. Design of Nodes of Mine-used Wireless Sensor Networks[J]. Journal of Mine Automation, 2010, 36(1): 76-78.
    [9]LV Ang, ZHOU Xue-jiao. Design of TTCAN Level1 Node Based on STM32[J]. Journal of Mine Automation, 2009, 35(10): 127-129.
    [10]DING Gang, YAN Hui, XIA Wei. Design of Alarming Node System for Gas of Coal Mine Based on CAN Bus[J]. Journal of Mine Automation, 2008, 34(2): 63-65.
  • Cited by

    Periodical cited type(5)

    1. 彭志军,梁云旺. Ovation DCS控制系统在火电厂自动配煤掺烧中的应用. 自动化应用. 2024(07): 87-89+93 .
    2. 田佳伟,唐子山. 基于边缘计算和ST-YOLO的矿井智能监控技术研究. 煤炭工程. 2024(07): 165-173 .
    3. 程德强,钱建生,郭星歌,寇旗旗,徐飞翔,顾军,高亚超,赵金升. 煤矿安全生产视频AI识别关键技术研究综述. 煤炭科学技术. 2023(02): 349-365 .
    4. 程德强,寇旗旗,江鹤,徐飞翔,宋天舒,王晓艺,钱建生. 全矿井智能视频分析关键技术综述. 工矿自动化. 2023(11): 1-21 . 本站查看
    5. 刘海锋. 基于低碳达峰方案的矿山智能化建设. 露天采矿技术. 2022(03): 121-124 .

    Other cited types(2)

Catalog

    ZHANG Hao

    1. On this Site
    2. On Google Scholar
    3. On PubMed

    Article Metrics

    Article views (187) PDF downloads (31) Cited by(7)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return