YANG Rui, CAO Kai, WANG Jiyu. Design of multivariate early warning management system for fully-mechanized coal mining equipment[J]. Journal of Mine Automation, 2018, 44(7): 96-99. DOI: 10.13272/j.issn.1671-251x.2018040063
Citation: YANG Rui, CAO Kai, WANG Jiyu. Design of multivariate early warning management system for fully-mechanized coal mining equipment[J]. Journal of Mine Automation, 2018, 44(7): 96-99. DOI: 10.13272/j.issn.1671-251x.2018040063

Design of multivariate early warning management system for fully-mechanized coal mining equipment

More Information
  • In view of problems of low accuracy, low efficiency and poor timeliness in current management mode of fully-mechanized coal mining equipment, a multivariate early warning management system for fully-mechanized coal mining equipment was designed. The system comprehensively analyzes data rules of equipment accident, equipment abnormality and maintenance, equipment repair and replacement and evaluates equipment operation state by collecting multivariate data from equipmen, personnel, production and working face, so as to realize early warning and prediction of equipment accident, planned active maintenance and spare parts procurement guidance. The system effectively reduces failure rate of fully-mechanized coal mining equipment and improves equipment management level of enterprise.
  • Related Articles

    [1]PU Yang, SONG Zhiqiang, NING Xiaoliang. Construction and application of multivariate data visualization system for coal and gas outburst predictio[J]. Journal of Mine Automation, 2020, 46(7): 64-69. DOI: 10.13272/j.issn.1671-251x.2020020054
    [2]CHEN Xiaolin, SUN Jinyu. Design of an intelligent seperated style gas inspection system for coal mine[J]. Journal of Mine Automation, 2016, 42(8): 6-9. DOI: 10.13272/j.issn.1671-251x.2016.08.002
    [3]DONG Dingwen, QU Shijia, WANG Honggang. Pre-warning method of gas concentration based on correlation analysis of monitoring data[J]. Journal of Mine Automation, 2015, 41(6): 1-5. DOI: 10.13272/j.issn.1671-251x.2015.06.001
    [4]QU Peng. Early warning system of shaft wall deformation based on optimization GM(1, 1)[J]. Journal of Mine Automation, 2014, 40(10): 64-67. DOI: 10.13272/j.issn.1671-251x.2014.10.017
    [5]FANG Gang, DI Ming, LIU Han-yong, DANG Chun-cai, LAN Wei. Early warning system for coal mine safety production based on fuzzy-analytical hierarchy process[J]. Journal of Mine Automation, 2013, 39(11): 98-102. DOI: 10.7526/j.issn.1671-251X.2013.11.026
    [6]DUAN Li-hong. Design of pre-warning system of coal mine water disaster[J]. Journal of Mine Automation, 2013, 39(9): 116-118. DOI: 10.7526/j.issn.1671-251X.2013.09.030
    [7]LI Hao-min, LU Jian-jun, WEI Che. Research of coal mine safety monitoring and early warning system based on cloud computing[J]. Journal of Mine Automation, 2013, 39(3): 46-49.
    [8]WANG Wei-feng, DENG Jun, WANG Cai-ping, FEI Jin-biao. Design of Wireless Remote Monitoring and Early-warning System of Coalfield Fire[J]. Journal of Mine Automation, 2012, 38(6): 1-3.
    [9]YAN Zhao-zhe. Design of Gas Abnormality Early-warning System of Coal Mine[J]. Journal of Mine Automation, 2011, 37(11): 1-3.
    [10]QIAO Shu-yun, LI De-chen, SHAO Xiao-ge. Design of Monitoring and Early Warning System for Coal Mine Grid Disaster and Its Implementatio[J]. Journal of Mine Automation, 2009, 35(1): 57-59.
  • Cited by

    Periodical cited type(6)

    1. 李亚勉,涂敏,赵庆冲,党嘉鑫,孙靖康. 深部巷道塑性区发育及巷道围岩变形解析. 煤矿机械. 2025(02): 96-99 .
    2. 王红. 巷道围岩承载层演化机理及特性分析. 山西冶金. 2024(04): 109-111 .
    3. 樊小峰,董情. 深埋软岩巷道围岩变形控制一体化支护技术. 能源与环保. 2023(03): 275-280 .
    4. 于建新,刘文金,王金星,刘焕春,周志彬. 层状岩体隧道爆破对支护体系的振动影响研究. 现代隧道技术. 2023(05): 99-110+119 .
    5. 柴敬,乔钰,高士岗,高登彦,陈苏社,吕情绪,杜文刚,韩志成. 分层开采下分层大断面开切眼顶板稳定性评估. 工矿自动化. 2022(05): 21-31 . 本站查看
    6. 李建平. 11-104回风顺槽分区域差异性联合支护技术应用. 江西煤炭科技. 2021(04): 12-14 .

    Other cited types(3)

Catalog

    Article Metrics

    Article views (70) PDF downloads (13) Cited by(9)
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return