ZHENG Xue-zhao, WANG Wei-feng, WU Jian-bin. Discussion on Underground Layout Scheme of Model JSG-8 Fire Monitoring System with Beam Tube[J]. Industry and Mine Automation, 2011, 37(10): 70-73.
Citation: ZHENG Xue-zhao, WANG Wei-feng, WU Jian-bin. Discussion on Underground Layout Scheme of Model JSG-8 Fire Monitoring System with Beam Tube[J]. Industry and Mine Automation, 2011, 37(10): 70-73.

Discussion on Underground Layout Scheme of Model JSG-8 Fire Monitoring System with Beam Tube

  • Publish Date: 2011-10-10
  • The paper introduced working principle and structure of model JSG-8 fire monitoring system with beam tube. For problem of difficult collection of gases of coal spontaneous combustion in coal face and goaf, it discussed layout scheme of beam tube monitoring points of the system in coal face and goaf in details, and indicated that it need consider influence degree on coal face production when making layout of beam tube monitoring points in coal face.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (41) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return