XU Hui-yong. Several Problems in Circulating Programmable Electric Control System of AC Hoisters[J]. Industry and Mine Automation, 2000, 26(5): 43-45.
Citation: XU Hui-yong. Several Problems in Circulating Programmable Electric Control System of AC Hoisters[J]. Industry and Mine Automation, 2000, 26(5): 43-45.

Several Problems in Circulating Programmable Electric Control System of AC Hoisters

  • Publish Date: 2000-10-10
  • The paper discusses the existing problems of vacuum commutator and rotor vacuum contactor in programmable electric control system of AC hoisters and puts forward the methods to solve them. It also introduces several links of control circuits and improving plan of the control system.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (40) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return