SUN Shi-cui, DING En-jie, XU Xiu. Research of Resource Management and Task Scheduling Based on Mine Safety Grid[J]. Industry and Mine Automation, 2007, 33(6): 1-4.
Citation: SUN Shi-cui, DING En-jie, XU Xiu. Research of Resource Management and Task Scheduling Based on Mine Safety Grid[J]. Industry and Mine Automation, 2007, 33(6): 1-4.

Research of Resource Management and Task Scheduling Based on Mine Safety Grid

  • Publish Date: 2007-12-10
  • Safety problem is an important problem that needed to be solved for coal mine. Based on the current communication networks of coal mine,the paper put forward a mine safety grid model based on the(development) of grid technology and expounded the management and scheduling of grid resources. Optimum resource management and scheduling strategy made it possible for grid calculation to get higher running capability, so it could provide good service for the grid calculation and the evaluation of mine safety.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (35) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return