CHEN Rong-guang~, YAN Xiao-feng~, LI Juan~. Research of Mine-used GEPON System and Its Implementatio[J]. Industry and Mine Automation, 2008, 34(5): 44-47.
Citation: CHEN Rong-guang~, YAN Xiao-feng~, LI Juan~. Research of Mine-used GEPON System and Its Implementatio[J]. Industry and Mine Automation, 2008, 34(5): 44-47.

Research of Mine-used GEPON System and Its Implementatio

  • Publish Date: 2008-10-10
  • Aiming at requirements of integration transmission of digital signal of industrial TV, monitoring and control information, voice information, a new integrated monitoring and control backbone network system - mine-used GEPON system was developed combining with development achievement of international telecommunication network technology. The paper expounded basic requirement of mine-used GEPON, analyzed structure characteristics of backup GEPON system, and put forward a heat backup self-cure ring for mine-used GEPON which considering cost, performance and construction. The system has characteristics such as low cost, wide band, reliable, stable and easy installment and maintainance.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (33) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return