MA Wei, BAO Guang-qing. Modeling and Simulation for Direct-drive Permanent Magnet Wind Power System[J]. Industry and Mine Automation, 2010, 36(8): 49-53.
Citation: MA Wei, BAO Guang-qing. Modeling and Simulation for Direct-drive Permanent Magnet Wind Power System[J]. Industry and Mine Automation, 2010, 36(8): 49-53.

Modeling and Simulation for Direct-drive Permanent Magnet Wind Power System

  • Publish Date: 2010-08-10
  • A mathematical model of direct-drive permanent magnet wind power system was built,which includes wind turbine model,drive train model,permanent magnet synchronous generator model and converter model as well.According to the maximum wind tracking principle,control strategies of converters at generator and power grid sides were put forward.The simulation model of the wind power system was built in Matlab/Simulink software environment,and the case of wind speed stepping change was simulated.The simulation result verified the validity of the control stratesy and the feasibility of the model.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (19) PDF downloads(3) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return