LIU Weipu, TAN Zhixiang, DENG Kazhong. Application of unequal interval grey model in mining subsidence predictio[J]. Industry and Mine Automation, 2014, 40(9): 6-10. doi: 10.13272/j.issn.1671-251x.2014.09.002
Citation: LIU Weipu, TAN Zhixiang, DENG Kazhong. Application of unequal interval grey model in mining subsidence predictio[J]. Industry and Mine Automation, 2014, 40(9): 6-10. doi: 10.13272/j.issn.1671-251x.2014.09.002

Application of unequal interval grey model in mining subsidence predictio

doi: 10.13272/j.issn.1671-251x.2014.09.002
  • Publish Date: 2014-09-10
  • For problems that mining subsidence prediction by use of gray model was only for one point at present and lacked overall subsidence prediction of working face as well as checkout of prediction accuracy, mining subsidence data was taken as research object which was monitored by surface observation station on strike line and dip line of working face, and interval of adjacent monitoring time was taken as weight to establish an unequal interval grey model for predicting subsidence value of the surface observation station at the next moment, thus subsidence curves of the strike line and the dip line were gotten. A parameter calculating method based on probability integral method was used to verify prediction accuracy of overall subsidence of working face. The difference between parameters calculated by use of prediction data and the ones by use of actual data is small, which verifies feasibility of the unequal interval grey model applied in prediction of overall mining subsidence.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (35) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return