GUO Qinghua, WEI Zhongkuan, ZHANG Shusen, et al. Design of 3D visualization management platform for intelligent coal preparation plant based on coal preparation information model[J]. Journal of Mine Automation,2022,48(11):54-62.  doi: 10.13272/j.issn.1671-251x.17936
Citation: GUO Qinghua, WEI Zhongkuan, ZHANG Shusen, et al. Design of 3D visualization management platform for intelligent coal preparation plant based on coal preparation information model[J]. Journal of Mine Automation,2022,48(11):54-62.  doi: 10.13272/j.issn.1671-251x.17936

Design of 3D visualization management platform for intelligent coal preparation plant based on coal preparation information model

doi: 10.13272/j.issn.1671-251x.17936
  • Received Date: 2022-04-18
  • Rev Recd Date: 2022-11-16
  • Available Online: 2022-11-23
  • At present, in the intelligent construction of coal preparation plant, there is little research and development on 3D visualization management centering on the whole life cycle from design, construction to production and operation and maintenance. There is also little research on the deep integration of 3D visualization and big data cloud platform. In view of the above problems, based on the building information model (BIM), this paper improves it and puts forward coal preparation information model (CPIM). The proposed model aims at the problem that BIM only considers the information model of coal preparation buildings and structures. BIM can not meet the needs of intelligent coal preparation plant construction. Combined with the big data cloud platform technology, a 3D visualization management platform for intelligent coal preparation plant based on CPIM (the platform consists of infrastructure layer, data sources layer, basic platform, application layer and business display layer) is designed. The data standard of coal washing engineering is constructed. The data access, management, storage, analysis and sharing of the whole life cycle of coal preparation design, construction, production and operation and maintenance are realized. The key technologies of the platform implementation of BIM lightweight engine, CPIM big data sub-platform construction, CPIM whole life cycle application, standard formulation of digital construction of coal washing project and software system independent research and development and domestic hardware adaptation are analyzed. Taking a coal preparation plant of China Coal Group as the research object, based on CPIM big data sub-platform and BIM 3D engine sub-platform, the CPIM whole life cycle 3D visualization application platform is constructed. And the localization adaptation of hardware is realized. The field application shows that the platform can carry out effective data acquisition, unified processing, storage, analysis and application for the design, construction and operation of coal preparation plant. The platform opens up the data channel of the coal washing industry. The platform realizes the 3D visualization management covering the whole life cycle of coal preparation plant design, construction, and production operation and maintenance.

     

  • loading
  • [1]
    陈小霞,郭莹,刘兆雪,等. 三维可视化信息管理系统在选煤生产中的应用[J]. 选煤技术,2022,50(2):95-100. doi: 10.16447/j.cnki.cpt.2022.02.019

    CHEN Xiaoxia,GUO Ying,LIU Zhaoxue,et al. Application of 3-dimensional visualized information management system in coal cleaning operations[J]. Coal Preparation Technology,2022,50(2):95-100. doi: 10.16447/j.cnki.cpt.2022.02.019
    [2]
    申迎松,荣东. 数字孪生与三维可视化在天地王坡选煤厂的应用实践[J]. 煤炭加工与综合利用,2022(8):26-29. doi: 10.16200/j.cnki.11-2627/td.2022.08.007

    SHEN Yingsong,RONG Dong. Application of digital hemitropism and 3D visualization in Tiandi Wangpo Coal Preparation Plant[J]. Coal Processing & Comprehensive Utilization,2022(8):26-29. doi: 10.16200/j.cnki.11-2627/td.2022.08.007
    [3]
    张帆,葛世荣,李闯. 智慧矿山数字孪生技术研究综述[J]. 煤炭科学技术,2020,48(7):168-176. doi: 10.13199/j.cnki.cst.2020.07.017

    ZHANG Fan,GE Shirong,LI Chuang. Research summary on digital twin technology for smart mines[J]. Coal Science and Technology,2020,48(7):168-176. doi: 10.13199/j.cnki.cst.2020.07.017
    [4]
    任文华,鲍震,苟晓东,等. 骆驼山选煤厂智能化综合管控平台的设计与实现[J]. 工业控制计算机,2021,34(11):138-140. doi: 10.3969/j.issn.1001-182X.2021.11.058

    REN Wenhua,BAO Zhen,GOU Xiaodong,et al. Intelligent comprehensive control platform for Luotuoshan Coal Preparation Plant[J]. Industrial Control Computer,2021,34(11):138-140. doi: 10.3969/j.issn.1001-182X.2021.11.058
    [5]
    邱加林. 三维协同设计技术BIM在选煤厂设计中的应用[J]. 科技创新与应用,2013(32):46.

    QIU Jialin. Application of three-dimensional collaborative design technology BIM in coal preparation plant design[J]. Technology Innovation and Application,2013(32):46.
    [6]
    李太友. 三维协同设计技术BIM在选煤厂设计中的应用[J]. 煤炭工程,2013,45(3):133-135.

    LI Taiyou. 3D coordinated design technology BIM applied to design of coal preparation plant[J]. Coal Engineering,2013,45(3):133-135.
    [7]
    林厦. BIM技术在选煤厂设计中的应用探讨[J]. 煤炭加工与综合利用,2019(3):29-32. doi: 10.16200/j.cnki.11-2627/td.2019.3.007

    LIN Sha. Discussion of BIM technology application on coal preparation plant design[J]. Coal Processing & Comprehensive Utilization,2019(3):29-32. doi: 10.16200/j.cnki.11-2627/td.2019.3.007
    [8]
    孙再征. BIM技术在选煤厂设计中的应用[J]. 选煤技术,2020,48(3):70-73,77. doi: 10.16447/j.cnki.cpt.2020.03.016

    SUN Zaizheng. Application of the building information management (BIM) technology in design of coal preparation plant[J]. Coal Preparation Technology,2020,48(3):70-73,77. doi: 10.16447/j.cnki.cpt.2020.03.016
    [9]
    潘伟. 基于大数据的智慧工厂制造优化技术研究[J]. 计算机技术与发展,2019,29(1):202-205. doi: 10.3969/j.issn.1673-629X.2019.01.042

    PAN Wei. Research on manufacturing optimization of intelligent factory based on big data[J]. Computer Technology and Development,2019,29(1):202-205. doi: 10.3969/j.issn.1673-629X.2019.01.042
    [10]
    黄贺. BIM技术在大柳塔煤矿项目中的应用研究[J]. 煤炭工程,2016,48(12):22-24.

    HUANG He. Application research of BIM technology in Daliuta Coal Mine[J]. Coal Engineering,2016,48(12):22-24.
    [11]
    BECERIKGERBER B,JAZIZADEH F,LI Nan,et al. Application areas and data requirements for BIM-enabled facilities management[J]. Journal of Construction Engineering & Management,2011,138(3):431-442.
    [12]
    AHUJA R,SAWHNEY A,ARIF M. Prioritizing BIM capabilities of an organization:an interpretive structural modeling analysis[J]. Procedia Engineering,2017,196:2-10. doi: 10.1016/j.proeng.2017.07.166
    [13]
    RAMAJI I J,MEMARI A M. Interpretation of structural analytical models from the coordination view in building information models[J]. Automation in Construction,2018,90:117-133. doi: 10.1016/j.autcon.2018.02.025
    [14]
    MATEJKA P,KOSINA V,TOMEK A,et al. The integration of BIM in later project life cycle phases in unprepared environment from FM perspective[J]. Procedia Engineering,2016,164:550-557.
    [15]
    VALINEJADSHOUBI M,MOSELHI O,BAGCHI A. Integrating BIM into sensor-based facilities management operations[J]. Journal of Facilities Management,2021,20(3):385-400.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(7)

    Article Metrics

    Article views (217) PDF downloads(58) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return