留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码

榆阳煤矿风积砂高水膨胀材料充填开采试验

陈拓其 党西峰

陈拓其,党西峰.榆阳煤矿风积砂高水膨胀材料充填开采试验[J].工矿自动化,2017,43(6):72-76..  doi: 10.13272/j.issn.1671-251x.2017.06.017
引用本文: 陈拓其,党西峰.榆阳煤矿风积砂高水膨胀材料充填开采试验[J].工矿自动化,2017,43(6):72-76..  doi: 10.13272/j.issn.1671-251x.2017.06.017
CHEN Tuoqi, DANG Xifeng. Experiment of backfill mining with aeolian sand high water swelling material in Yuyang Coal Mine[J]. Industry and Mine Automation, 2017, 43(6): 72-76. doi: 10.13272/j.issn.1671-251x.2017.06.017
Citation: CHEN Tuoqi, DANG Xifeng. Experiment of backfill mining with aeolian sand high water swelling material in Yuyang Coal Mine[J]. Industry and Mine Automation, 2017, 43(6): 72-76. doi: 10.13272/j.issn.1671-251x.2017.06.017

榆阳煤矿风积砂高水膨胀材料充填开采试验

doi: 10.13272/j.issn.1671-251x.2017.06.017
详细信息
  • 中图分类号: TD823

Experiment of backfill mining with aeolian sand high water swelling material in Yuyang Coal Mine

  • 摘要: 以榆阳煤矿2307综采充填工作面为背景,采用风积砂高水膨胀材料充填技术进行了开采试验。充填材料主要为风积砂、粉煤灰、石膏、生石灰等常用建筑材料,根据充填材料要求并通过试验确定了配比为风积砂366.3 kg/m3、粉煤灰366.3 kg/m3、辅料81.6 kg/m3、水650.8 kg/m3;按照满足直接顶不出现初次断裂的条件,得出充填步距为6.4 m;采用2套充填能力为180 m3/h的充填料浆制备装置和充填管路对工作面采空区进行充填,充填能力达360 m3/h;提出了具体的充填工艺流程。试验结果表明,工作面无明显来压现象,充填体强度基本满足要求,巷道围岩变形较小,有效控制了地表下沉,达到了保水采煤的目标,提高了矿区经济效益。

     

  • 加载中
计量
  • 文章访问数:  25
  • HTML全文浏览量:  2
  • PDF下载量:  5
  • 被引次数: 0
出版历程
  • 刊出日期:  2017-06-10

目录

    /

    返回文章
    返回