Current leakage protection method of coal mine based on time-sharing ratio of phase current amplitude
-
摘要: 针对中性点经消弧线圈接地系统发生单相接地故障时接地点故障电流较小的问题,提出一种基于相电流幅值分时比值的煤矿漏电保护方法。该方法通过采样计算,获得线路暂态相电流互积求和比值和稳态相电流互积求和比值,分别进行暂态和稳态漏电保护,根据相电流比值较大的判据结果作出漏电保护判断结论,从而自动选出故障线路并跳闸。Matlab仿真结果表明,该方法可有效实现漏电保护,选线判断结果准确可靠。Abstract: For the problem that failure current was small of grounding point of neutral point grounding system grounded by arc suppression coil when single-phase ground fault occurs, the paper proposed a kind of current leakage protection method of coal mine based on time-sharing ratio of phase current amplitude. The method obtains summation ratio of mutual integral of transient current and steady-state phase current by sampling and calculation, and conducts leakage protection of transient current and steady-state phase current respectively, then makes judge conclusion according to the larger phase current ratio, so as to automatically select the fault line and trip. The Matlab simulation results show that the method can effectively achieve leakage protection, and the line selection results are accurate and reliable.
点击查看大图
计量
- 文章访问数: 12
- HTML全文浏览量: 1
- PDF下载量: 4
- 被引次数: 0